B & D Manufacturing
Industrial
The work consisted of the design-build of a new office and manufacturing facility for B&D Manufacturing. Our team took and aggressive approach with the preparation of the design and construction documents in order to expedite the construction start. This approach allowed B & D to move seamlessly from an existing rental facility to the new manufacturing location. The entire project was completed in four months.
Project Team
Louis Bélanger – Principal, Project Architect
Bill Boudreau – Lead Technical Staff
Robert André – Technical Staff
Ted Matheson – Design and Visualization
Andrea Tann – Interior Design
Denis Comtois – Lead Interior Design
Project Facts
- Location: Chelmsford, ON
- Completion: 2007
- Building Area: 7 000 sq. ft.
- Industry: Industrial